Coverage: 220-260 square feet per gallon
INSTALLATION
Z301 evenly with the proper trowel as described. Flash time and working time are influenced by substrate porosity and atmospheric
conditions (i.e., temperature, humidity, and air movement).The higher the temperature,the lower the humidity;and the more porous
the substrate, the faster the flash time and the shorter the working time. For best results, maintain adhesive, floor covering,and
room at a stable temperature of 65°F to 95°F (18°C to 35°C) for 24 hours before and after installation. Flooring may be installed
when the adhesive has flashed off sufficiently to prevent adhesive transfer to the fingertips, usually after 10-20 minutes for porous
substrates, or 30-60 minutes on non-porous substrates. Do not install flooring in wet adhesive on non - porous
substrates. Always follow the flooring manufacturer's installation guideline. Flooring must be installed within the working time, up
to 4 hours after flash time. Follow manufacturer recommendations for rolling and/or cross-rolling the flooring during installation.
CURE TIME
Traffic: Normal traffic may resume after 24 hours. Avoid high rolling loads for 72 hours. Wet mopping can be done after 1 week.
CLEANUP AND STORAGE
As you work, immediately clean any adhesive from resilient flooring using a clean, damp cloth. Immediately clean all tools and
equipment before adhesive cures.Follow flooring manufacturer's recommendation for cleanup. Use of mineral spirits or other
solvent may be needed to remove dried adhesive. Some flooring may not be compatible with solvents such as mineral spirits. The
product should be stored in the original container in a cool,dry place and out of direct sunlight. Do not allow product to freeze. If the
product should freeze, store at 75°F (25°C) until completely thawed, then thoroughly mix contents. Test carefully to ensure the
product performance has not been compromised.